Drilling Yard Remediation
- Project Tags: Soil, TPH Remediation
At a drilling yard, our technology was used to reduce TPH in soil. A Phase II report on the property revealed an average of 6000 ppm TPH in 490 yard3 of soil. After our product was applied, a reduction to 138-120 ppm TPH was shown in just five days. Further reduction (with no further treatment) showed results down to 23-10 ppm after 27 days.